Free Demo Questions

Test Online Free HP HPE0-S60 Exam Questions and Answers

Practice a live sample before buying full access. This page keeps the free HPE0-S60 question set organized by page so visitors and search engines can reach the canonical -questions.html URL directly.

Updated Oct 11, 2023 16 Questions 2 Pages
Page 1 of 2
Next Page
Question 1 Selectable Answer
Which statement about HPE Apollo 2000 Gen10 Plus platform is true?

Answer:
Question 2 Selectable Answer
What is a restriction of using a RoCE network?

Answer:
Question 3 Written Answer
DRAG DROP
Put the steps of the HPE infosight flow in the correct order.


Answer:


Explanation:
(observing, learning, predicting, recommending, acting)
Question 4 Selectable Answer
Which statement about manual orchestration during the firmware update is true?

Answer:
Question 5 Written Answer
DRAG DROP
After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.
Put the steps on the left into the coned order on the right to perform this task.


Answer:

Question 6 Selectable Answer
As a result of the troubleshooting process, you recommend replacing, HPE Synergy Composer modules which HPE Synergy Composer 2
Why would you recommend this change?

Answer:
Question 7 Selectable Answer
Your customer plans to deploy ESXi systems to HPE Synergy and HPE ProLiant servers using HPE OneView for VMware vCenter Server.
Which statement about HPE OneView for VMware vCenter Server functionality is true for this environment?

Answer:
Question 8 Written Answer
DRAG DROP
Match HPE Superdome Flex system with its specific feature.


Answer:


Explanation:
HPE Superdome flex in all 4
Question 9 Written Answer
HOTSPOT
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement


Answer:

Question 10 Selectable Answer
Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards
They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration
- two HPE Synergy Virtual Connect SE 32Gb FC Modules
- two HPE Synergy 20Gb interconnect Link Modules
- Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards.
Which statement about the planned configuration change is true?

Answer:
Question 11 Selectable Answer
Your customer reports that they cannot deploy HPE Synergy compute nodes using HPE OneView for VMware vCenter Server (HPE OV4VC).
What should you check during troubleshooting process?

Answer:
Question 12 Selectable Answer
A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?

Answer:
Question 13 Selectable Answer
Refer to the exhibit.



Which statement about this logical JBOD is true?

Answer:
Question 14 Selectable Answer
Which statement about the SY480 Gen10 Plus Compute Module is true?

Answer:
Question 15 Selectable Answer
Your customer has the following HPE Synergy setup
- 3 HPE Synergy 12000 Frames
- 4 HPE Virtual Connect SE 100 Gb F32 Modules
- 2 HPE Synergy 50 GO Interconnect Link Modules
- 36 HPE Synergy 480 Gen10 Plus compute modules
- 2 HPE Composer 2 modules
Which statement about this setup is true?

Answer:
Showing page 1 of 2
Next Page